中文字幕国产精品-91亚洲精品久久久久久久久久久久-久久狠狠干-日本一区高清-东京热一区二区三区四区-色干网-日本xxxx高清-极品人妻一区二区-精品无码一区二区三区免费-2022av视频-国产一区二区伦理片

Position: 首頁 < Home < News < Company News

Kexu Tianshan Waste Heat Power Generation Project connected to grid

PublishDate:2024-04-02 Source:


  Recently, Kexu Tianshan Waste Heat Power Generation Project, general contracted by Sinoma Energy Conservation, was successfully connected to the grid. The project is located in the heavy industrial park of Atushi City, Xinjiang. The scope of the project includes the design of the waste heat power generation, the supply of equipment and the commissioning of the waste heat power generation system, and the contract was signed on July 26, 2023, the clock started on August 6 of the same year, and the unit was connected to the grid on April 2, 2024, which was completed.

  

  After the signing of the project, in order to ensure the power generation on schedule, the project department carefully planned the work arrangement of each stage. In the pre-project preparation stage, the project department actively coordinates with various departments to complete the basic design and procurement work in time; in the installation and commissioning stage, all the members of the project department overcome all the difficulties and stick to the construction site, which ensures that the project will reach the project nodes according to the contract as scheduled.

   

  After the project is connected to the grid, it is expected that the daily power generation will reach more than 216,000kwh, which has good economic, environmental and social benefits.

  


主站蜘蛛池模板: 莱西市| 崇礼县| 郴州市| 桂东县| 舟曲县| 慈溪市| 黔东| 巴楚县| 灌云县| 富川| 宜州市| 龙口市| 岳池县| 嘉善县| 双流县| 盐亭县| 凤山县| 灌南县| 武清区| 甘德县| 瓮安县| 锦州市| 承德市| 睢宁县| 保山市| 剑川县| 墨脱县| 巴马| 宜兰县| 朝阳市| 十堰市| 监利县| 丰台区| 泾阳县| 郑州市| 察隅县| 满城县| 泰宁县| 楚雄市| 竹溪县| 柳州市| ?